Renovations continue
Construction work continues on the 914th Airlift Wing headquarters building at the Niagara Falls Air Reserve Station, N.Y. on December 14, 2016. The 10.9 million dollar U.S. Army Corps of Engineers project is scheduled to be completed this time next year. Everything except the main structure is being removed from the 1950s era building to make way for a new, more efficient open concept facility that is designed for maximum space utilization and energy efficiency. A minor interior renovation was last done in 1995. (U.S. Air Force Photo by Peter Borys)
PHOTO BY:
Peter Borys
VIRIN:
161214-F-YZ899-006.JPG
FULL SIZE:
1.24 MB
CAMERA
N/A
LENS
N/A
APERTURE
N/A
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.